2 of 4 inspections complete, 2 of 4 inspections passed, 1 pending, 1 to be scheduled
Septic: 1000 gallon concrete tank in perfect shape. No leaks, no problems with the drain fields, it’s located in an out of the way area that we don’t plan to garden or carry heavy equipment over. And they empty it when they inspect it so no need to service it for a couple years.
Termites: No termites or termite damage. I will be installing termite protection on my own once we move in.
Well/Water: Will take a few days for the water test to complete, but sample was taken today.
FHA Loan Inspection: Not scheduled yet. I know of at least one thing they will have problems with, no hand railings going upstairs. If the seller doesn’t install one, I have no problems installing one myself.
Entry viewed times. Posted in house buying
One Response to “2 of 4 inspections complete, 2 of 4 inspections passed, 1 pending, 1 to be scheduled”

November 9th, 2008 at 8:19 am
[…] Critical Protection Solutions for Mission Critical Operations Saved by squirky on Sat 08-11-2008 2 of 4 inspections complete, 2 of 4 inspections passed, 1 pending, 1 to be scheduled Saved by sirfreakthemighty on Sat 08-11-2008 What Did She Say? Protection Saved by Narutoeviltwin […]